The Apollo program, also known as Project Apollo, was the United States human spaceflight program led by NASA, which Moon landing the first humans on the Moon in 1969. Apollo was conceived during Project Mercury and executed after Project Gemini. It was conceived in 1960 as a three-person spacecraft during the presidency of Dwight D. Eisenhower. Apollo was later dedicated to President John F. Kennedy's national goal for the 1960s of "landing a man on the Moon and returning him safely to the Earth" in an address to the U.S. Congress on May 25, 1961.
Kennedy's goal was accomplished on the Apollo 11 mission, when astronauts Neil Armstrong and Buzz Aldrin landed their Apollo Lunar Module (LM) on July 20, 1969, and walked on the lunar surface, while Michael Collins remained in lunar orbit in the command and service module (CSM), and all three landed safely on Earth in the Pacific Ocean on July 24. Five subsequent Apollo missions also landed on the Moon, the last, Apollo 17, in December 1972. In these six spaceflights, twelve people walked on the Moon.
Apollo ran from 1961 to 1972, with the first crewed flight in 1968. It encountered a major setback in 1967 when the Apollo 1 cabin fire killed the entire crew during a prelaunch test. After the first Moon landing, sufficient flight hardware remained for nine follow-on landings with a plan for extended lunar geological and astrophysics exploration. Budget cuts forced the cancellation of three of these. Five of the remaining six missions achieved landings; but the Apollo 13 landing had to be aborted after an oxygen tank exploded en route to the Moon, crippling the CSM. The crew barely managed a safe return to Earth by using the Lunar Module as a "lifeboat" on the return journey. Apollo used the Saturn family of rockets as launch vehicles, which were also used for an Apollo Applications Program, which consisted of Skylab, a space station that supported three crewed missions in 1973–1974, and the Apollo–Soyuz Test Project, a joint United States-Soviet Union low Earth orbit mission in 1975.
Apollo set several major human spaceflight milestones. It stands alone in sending crewed missions beyond low Earth orbit. Apollo 8 was the first crewed spacecraft to orbit another celestial body, and Apollo 11 was the first crewed spacecraft to land humans on one.
Overall, the Apollo program returned of lunar rocks and soil to Earth, greatly contributing to the understanding of the Moon's composition and geological history. The program laid the foundation for NASA's subsequent human spaceflight capability and funded construction of its Johnson Space Center and Kennedy Space Center. Apollo also spurred advances in many areas of technology incidental to and human spaceflight, including avionics, telecommunications, and .
The context of this was that the program focused at its beginning mainly on developing an advanced crewed spacecraft, the Apollo command and service module, succeeding the Mercury program. A lunar landing became the focus of the program only in 1961. Thereafter Project Gemini instead followed the Mercury program to test and study advanced crewed spaceflight technology.
In July 1960, NASA Deputy Administrator Hugh L. Dryden announced the Apollo program to industry representatives at a series of Space Task Group conferences. Preliminary specifications were laid out for a spacecraft with a mission module cabin separate from the command module (piloting and reentry cabin), and a propulsion and equipment module. On August 30, a feasibility study competition was announced, and on October 25, three study contracts were awarded to Convair, General Electric, and the Glenn L. Martin Company. Meanwhile, NASA performed its own in-house spacecraft design studies led by Maxime Faget, to serve as a gauge to judge and monitor the three industry designs.
On April 12, 1961, Soviet cosmonaut Yuri Gagarin became the first person to fly in space, reinforcing American fears about being left behind in a technological competition with the Soviet Union. At a meeting of the US House Committee on Science and Astronautics one day after Gagarin's flight, many congressmen pledged their support for a crash program aimed at ensuring that America would catch up.87th Congress 1961 Kennedy was circumspect in his response to the news, refusing to make a commitment on America's response to the Soviets.Sidey 1963, p. 114
On April 20, Kennedy sent a memo to Vice President Lyndon B. Johnson, asking Johnson to look into the status of America's space program, and into programs that could offer NASA the opportunity to catch up. Key Apollo Source Documents . Johnson responded approximately one week later, concluding that "we are neither making maximum effort nor achieving results necessary if this country is to reach a position of leadership." Key Apollo Source Documents . His memo concluded that a crewed Moon landing was far enough in the future that it was likely the United States would achieve it first.
On May 25, 1961, twenty days after the first American crewed spaceflight Freedom 7, Kennedy proposed the crewed Moon landing in a Special Message to the Congress on Urgent National Needs:
With the clear goal of a crewed landing replacing the more nebulous goals of space stations and circumlunar flights, NASA decided that, in order to make progress quickly, it would discard the feasibility study designs of Convair, GE, and Martin, and proceed with Faget's command and service module design. The mission module was determined to be useful only as an extra room, and therefore unnecessary. They used Faget's design as the specification for another competition for spacecraft procurement bids in October 1961. On November 28, 1961, it was announced that North American Aviation had won the contract, although its bid was not rated as good as the Martin proposal. Webb, Dryden and Robert Seamans chose it in preference due to North American's longer association with NASA and its predecessor.
Landing humans on the Moon by the end of 1969 required the most sudden burst of technological creativity, and the largest commitment of resources ($25 billion; $ in US dollars) ever made by any nation in peacetime. At its peak, the Apollo program employed 400,000 people and required the support of over 20,000 industrial firms and universities.
On July 1, 1960, NASA established the Marshall Space Flight Center (MSFC) in Huntsville, Alabama. MSFC designed the heavy lift-class Saturn launch vehicles, which would be required for Apollo.
In September 1962, by which time two Project Mercury astronauts had orbited the Earth, Gilruth had moved his organization to rented space in Houston, and construction of the MSC facility was under way, Kennedy visited Rice to reiterate his challenge in a famous speech:
The MSC was completed in September 1963. It was renamed by the United States Congress in honor of Lyndon B. Johnson soon after his death in 1973.
The LOC included Launch Complex 39, a Launch Control Center, and a Vertical Assembly Building (VAB).The building was renamed "Vehicle Assembly Building" on February 3, 1965. in which the space vehicle (launch vehicle and spacecraft) would be assembled on a mobile launcher platform and then moved by a crawler-transporter to one of several launch pads. Although at least three pads were planned, only two, designated AandB, were completed in October 1965. The LOC also included an Operations and Checkout Building (OCB) to which Project Gemini and Apollo spacecraft were initially received prior to being mated to their launch vehicles. The Apollo spacecraft could be tested in two capable of simulating atmospheric pressure at altitudes up to , which is nearly a vacuum.
Based on his industry experience on Air Force missile projects, Mueller realized some skilled managers could be found among high-ranking officers in the U.S. Air Force, so he got Webb's permission to recruit General Samuel C. Phillips, who gained a reputation for his effective management of the Minuteman program, as OMSF program controller. Phillips's superior officer Bernard A. Schriever agreed to loan Phillips to NASA, along with a staff of officers under him, on the condition that Phillips be made Apollo Program Director. Mueller agreed, and Phillips managed Apollo from January 1964, until it achieved the first human landing in July 1969, after which he returned to Air Force duty.
Charles Fishman, in One Giant Leap, estimated the number of people and organizations involved into the Apollo program as "410,000 men and women at some 20,000 different companies contributed to the effort".
In early 1961, direct ascent was generally the mission mode in favor at NASA. Many engineers feared that rendezvous and docking, maneuvers that had not been attempted in Geocentric orbit, would be nearly impossible in lunar orbit. LOR advocates including John Houbolt at Langley Research Center emphasized the important weight reductions that were offered by the LOR approach. Throughout 1960 and 1961, Houbolt campaigned for the recognition of LOR as a viable and practical option. Bypassing the NASA hierarchy, he sent a series of memos and reports on the issue to Associate Administrator Robert Seamans; while acknowledging that he spoke "somewhat as a voice in the wilderness", Houbolt pleaded that LOR should not be discounted in studies of the question.
Seamans's establishment of an ad hoc committee headed by his special technical assistant Nicholas E. Golovin in July 1961, to recommend a launch vehicle to be used in the Apollo program, represented a turning point in NASA's mission mode decision.Hansen 1999, p. 32 This committee recognized that the chosen mode was an important part of the launch vehicle choice, and recommended in favor of a hybrid EOR-LOR mode. Its consideration of LOR—as well as Houbolt's ceaseless work—played an important role in publicizing the workability of the approach. In late 1961 and early 1962, members of the Manned Spacecraft Center began to come around to support LOR, including the newly hired deputy director of the Office of Manned Space Flight, Joseph Shea, who became a champion of LOR.Hansen 1999, pp. 35–39 The engineers at Marshall Space Flight Center (MSFC), who were heavily invested in direct ascent, took longer to become convinced of its merits, but their conversion was announced by Wernher von Braun at a briefing on June 7, 1962.
But even after NASA reached internal agreement, it was far from smooth sailing. Kennedy's science advisor Jerome Wiesner, who had expressed his opposition to human spaceflight to Kennedy before the President took office, and had opposed the decision to land people on the Moon, hired Golovin, who had left NASA, to chair his own "Space Vehicle Panel", ostensibly to monitor, but actually to second-guess NASA's decisions on the Saturn V launch vehicle and LOR by forcing Shea, Seamans, and even Webb to defend themselves, delaying its formal announcement to the press on July 11, 1962, and forcing Webb to still hedge the decision as "tentative".
Wiesner kept up the pressure, even making the disagreement public during a two-day September visit by the President to Marshall Space Flight Center. Wiesner blurted out "No, that's no good" in front of the press, during a presentation by von Braun. Webb jumped in and defended von Braun, until Kennedy ended the squabble by stating that the matter was "still subject to final review". Webb held firm and issued a request for proposal to candidate Lunar Excursion Module (LEM) contractors. Wiesner finally relented, unwilling to settle the dispute once and for all in Kennedy's office, because of the President's involvement with the October Cuban Missile Crisis, and fear of Kennedy's support for Webb. NASA announced the selection of Grumman as the LEM contractor in November 1962.
Space historian James Hansen concludes that:
The LOR method had the advantage of allowing the lander spacecraft to be used as a "lifeboat" in the event of a failure of the command ship. Some documents prove this theory was discussed before and after the method was chosen. In 1964 an MSC study concluded, "The LM as... was finally dropped, because no single reasonable CSM failure could be identified that would prohibit use of the SPS." Ironically, just such a failure happened on Apollo 13 when an oxygen tank explosion left the CSM without electrical power. The lunar module provided propulsion, electrical power and life support to get the crew home safely.
A cylindrical service module (SM) supported the command module, with a service propulsion engine and an RCS with propellants, and a fuel cell power generation system with liquid hydrogen and liquid oxygen reactants. A high-gain S band antenna was used for long-distance communications on the lunar flights. On the extended lunar missions, an orbital scientific instrument package was carried. The service module was discarded just before reentry. The module was long and in diameter. The initial lunar flight version weighed approximately fully fueled, while a later version designed to carry a lunar orbit scientific instrument package weighed just over .
North American Aviation won the contract to build the CSM, and also the second stage of the Saturn V launch vehicle for NASA. Because the CSM design was started early before the selection of lunar orbit rendezvous, the service propulsion engine was sized to lift the CSM off the Moon, and thus was oversized to about twice the thrust required for translunar flight.Wilford 1969, p. 167 Also, there was no provision for docking with the lunar module. A 1964 program definition study concluded that the initial design should be continued as Block I which would be used for early testing, while Block II, the actual lunar spacecraft, would incorporate the docking equipment and take advantage of the lessons learned in Block I development.
Since Apollo, like Mercury, used more than one launch vehicle for space missions, NASA used spacecraft-launch vehicle combination series numbers: AS-10x for Saturn I, AS-20x for Saturn IB, and AS-50x for Saturn V (compare Mercury-Redstone 3, Mercury-Atlas 6) to designate and plan all missions, rather than numbering them sequentially as in Project Gemini. This was changed by the time human flights began.
The first four Saturn I test flights were launched from LC-34, with only the first stage live, carrying dummy upper stages filled with water. The first flight with a live S-IV was launched from LC-37. This was followed by five launches of boilerplate CSMs (designated AS-101 through AS-105) into orbit in 1964 and 1965. The last three of these further supported the Apollo program by also carrying Pegasus satellites, which verified the safety of the translunar environment by measuring the frequency and severity of micrometeorite impacts.
In September 1962, NASA planned to launch four crewed CSM flights on the Saturn I from late 1965 through 1966, concurrent with Project Gemini. The payload capacity would have severely limited the systems which could be included, so the decision was made in October 1963 to use the uprated Saturn IB for all crewed Earth orbital flights.
Thirty-two astronauts were assigned to fly missions in the Apollo program. Twenty-four of these left Earth's orbit and flew around the Moon between December 1968 and December 1972 (three of them twice). Half of the 24 walked on the Moon's surface, though none of them returned to it after landing once. One of the moonwalkers was a trained geologist. Of the 32, Gus Grissom, Ed White, and Roger Chaffee were killed during a ground test in preparation for the Apollo 1 mission.
The Apollo astronauts were chosen from the Project Mercury and Gemini veterans, plus from two later astronaut groups. All missions were commanded by Gemini or Mercury veterans. Crews on all development flights (except the Earth orbit CSM development flights) through the first two landings on Apollo 11 and Apollo 12, included at least two (sometimes three) Gemini veterans. Harrison Schmitt, a geologist, was the first NASA scientist astronaut to fly in space, and landed on the Moon on the last mission, Apollo 17. Schmitt participated in the lunar geology training of all of the Apollo landing crews.
NASA awarded all 32 of these astronauts its highest honor, the Distinguished Service Medal, given for "distinguished service, ability, or courage", and personal "contribution representing substantial progress to the NASA mission". The medals were awarded posthumously to Grissom, White, and Chaffee in 1969, then to the crews of all missions from Apollo 8 onward. The crew that flew the first Earth orbital test mission Apollo 7, Wally Schirra, Donn Eisele, and Walter Cunningham, were awarded the lesser NASA Exceptional Service Medal, because of discipline problems with the flight director's orders during their flight. In October 2008, the NASA Administrator decided to award them the Distinguished Service Medals. For Schirra and Eisele, this was posthumously.
Two Block I CSMs were launched from LC-34 on suborbital flights in 1966 with the Saturn IB. The first, AS-201 launched on February 26, reached an altitude of and splashed down downrange in the Atlantic Ocean. The second, AS-202 on August 25, reached altitude and was recovered downrange in the Pacific Ocean. These flights validated the service module engine and the command module heat shield.
A third Saturn IB test, AS-203 launched from pad 37, went into orbit to support design of the S-IVB upper stage restart capability needed for the Saturn V. It carried a nose cone instead of the Apollo spacecraft, and its payload was the unburned liquid hydrogen fuel, the behavior of which engineers measured with temperature and pressure sensors, and a TV camera. This flight occurred on July 5, before AS-202, which was delayed because of problems getting the Apollo spacecraft ready for flight.
After an uncrewed LM test flight AS-206, a crew would fly the first Block II CSM and LM in a dual mission known as AS-207/208, or AS-278 (each spacecraft would be launched on a separate Saturn IB). The Block II crew positions were titled Commander, Command Module Pilot, and Lunar Module Pilot. The astronauts would begin wearing a new Apollo A6L spacesuit, designed to accommodate lunar extravehicular activity (EVA). The traditional visor helmet was replaced with a clear "fishbowl" type for greater visibility, and the lunar surface EVA suit would include a water-cooled undergarment.
Deke Slayton, the grounded Mercury Seven who became director of flight crew operations for the Gemini and Apollo programs, selected the first Apollo crew in January 1966, with Grissom as Command Pilot, White as Senior Pilot, and rookie Donn F. Eisele as Pilot. But Eisele dislocated his shoulder twice aboard the KC135 weightlessness training aircraft, and had to undergo surgery on January 27. Slayton replaced him with Chaffee. NASA announced the final crew selection for AS-204 on March 21, 1966, with the backup crew consisting of Gemini veterans James McDivitt and David Scott, with rookie Russell L. "Rusty" Schweickart. Mercury/Gemini veteran Wally Schirra, Eisele, and rookie Walter Cunningham were announced on September 29 as the prime crew for AS-205.
In December 1966, the AS-205 mission was canceled, since the validation of the CSM would be accomplished on the 14-day first flight, and AS-205 would have been devoted to space experiments and contribute no new engineering knowledge about the spacecraft. Its Saturn IB was allocated to the dual mission, now redesignated AS-205/208 or AS-258, planned for August 1967. McDivitt, Scott and Schweickart were promoted to the prime AS-258 crew, and Schirra, Eisele and Cunningham were reassigned as the Apollo1 backup crew.
North American Aviation was prime contractor not only for the Apollo CSM, but for the SaturnV S-II second stage as well, and delays in this stage pushed the first uncrewed SaturnV flight AS-501 from late 1966 to November 1967. (The initial assembly of AS-501 had to use a dummy spacer spool in place of the stage.)
The problems with North American were severe enough in late 1965 to cause Manned Space Flight Administrator George Mueller to appoint program director Samuel Phillips to head a "tiger team" to investigate North American's problems and identify corrections. Phillips documented his findings in a December 19 letter to NAA president Lee Atwood, with a strongly worded letter by Mueller, and also gave a presentation of the results to Mueller and Deputy Administrator Robert Seamans.NASA never volunteered the tiger team findings to the US Congress in the course of its regular oversight, but its existence was publicly disclosed as "the Phillips report" in the course of the Senate investigation into the Apollo 204 fire. Meanwhile, Grumman was also encountering problems with the Lunar Module, eliminating hopes it would be ready for crewed flight in 1967, not long after the first crewed CSM flights.
The plugs-out test began on the morning of January 27, 1967, and immediately was plagued with problems. First, the crew noticed a strange odor in their spacesuits which delayed the sealing of the hatch. Then, communications problems frustrated the astronauts and forced a hold in the simulated countdown. During this hold, an electrical fire began in the cabin and spread quickly in the high pressure, 100% oxygen atmosphere. Pressure rose high enough from the fire that the cabin inner wall burst, allowing the fire to erupt onto the pad area and frustrating attempts to rescue the crew. The astronauts were asphyxiated before the hatch could be opened.
NASA immediately convened an accident review board, overseen by both houses of Congress. While the determination of responsibility for the accident was complex, the review board concluded that "deficiencies existed in command module design, workmanship and quality control". At the insistence of NASA Administrator Webb, North American removed Harrison Storms as command module program manager.Gray 1994 Webb also reassigned Apollo Spacecraft Program Office (ASPO) Manager Joseph Francis Shea, replacing him with George Low.Ertel et al. 1978, p. 119
To remedy the causes of the fire, changes were made in the Block II spacecraft and operational procedures, the most important of which were use of a nitrogen/oxygen mixture instead of pure oxygen before and during launch, and removal of flammable cabin and space suit materials. The Block II design already called for replacement of the Block I plug door hatch cover with a quick-release, outward opening door. NASA discontinued the crewed Block I program, using the BlockI spacecraft only for uncrewed SaturnV flights. Crew members would also exclusively wear modified, fire-resistant A7L Block II space suits, and would be designated by the Block II titles, regardless of whether a LM was present on the flight or not.
In September 1967, Mueller approved a sequence of mission types which had to be accomplished in order to achieve the crewed lunar landing. Each step had to be accomplished before the next ones could be performed, and it was unknown how many tries of each mission would be necessary; therefore letters were used instead of numbers. The A missions were uncrewed Saturn V validation; B was uncrewed LM validation using the Saturn IB; C was crewed CSM Earth orbit validation using the Saturn IB; D was the first crewed CSM/LM flight (this replaced AS-258, using a single Saturn V launch); E would be a higher Earth orbit CSM/LM flight; F would be the first lunar mission, testing the LM in lunar orbit but without landing (a "dress rehearsal"); and G would be the first crewed landing. The list of types covered follow-on lunar exploration to include H lunar landings, I for lunar orbital survey missions, and J for extended-stay lunar landings.Ertel et al. 1978, p. 157
The delay in the CSM caused by the fire enabled NASA to catch up on human-rating the LM and SaturnV. Apollo4 (AS-501) was the first uncrewed flight of the SaturnV, carrying a BlockI CSM on November 9, 1967. The capability of the command module's heat shield to survive a trans-lunar reentry was demonstrated by using the service module engine to ram it into the atmosphere at higher than the usual Earth-orbital reentry speed.
Apollo 5 (AS-204) was the first uncrewed test flight of the LM in Earth orbit, launched from pad 37 on January 22, 1968, by the Saturn IB that would have been used for Apollo 1. The LM engines were successfully test-fired and restarted, despite a computer programming error, which cut short the first descent stage firing. The ascent engine was fired in abort mode, known as a "fire-in-the-hole" test, where it was lit simultaneously with jettison of the descent stage. Although Grumman wanted a second uncrewed test, George Low decided the next LM flight would be crewed.
This was followed on April 4, 1968, by Apollo 6 (AS-502) which carried a CSM and a LM Test Article as ballast. The intent of this mission was to achieve trans-lunar injection, followed closely by a simulated direct-return abort, using the service module engine to achieve another high-speed reentry. The Saturn V experienced pogo oscillation, a problem caused by non-steady engine combustion, which damaged fuel lines in the second and third stages. Two S-II engines shut down prematurely, but the remaining engines were able to compensate. The damage to the third stage engine was more severe, preventing it from restarting for trans-lunar injection. Mission controllers were able to use the service module engine to essentially repeat the flight profile of Apollo 4. Based on the good performance of Apollo6 and identification of satisfactory fixes to the Apollo6 problems, NASA declared the SaturnV ready to fly crew, canceling a third uncrewed test.
Apollo 7, launched from LC-34 on October 11, 1968, was the Cmission, crewed by Wally Schirra, Eisele, and Cunningham. It was an 11-day Earth-orbital flight which tested the CSM systems.
Apollo 8 was planned to be the D mission in December 1968, crewed by McDivitt, Scott and Schweickart, launched on a SaturnV instead of two Saturn IBs. In the summer it had become clear that the LM would not be ready in time. Rather than waste the Saturn V on another simple Earth-orbiting mission, ASPO Manager George Low suggested the bold step of sending Apollo8 to orbit the Moon instead, deferring the Dmission to the next mission in March 1969, and eliminating the E mission. This would keep the program on track. The Soviet Union had sent two tortoises, mealworms, wine flies, and other lifeforms around the Moon on September 15, 1968, aboard Zond 5, and it was believed they might soon repeat the feat with human cosmonauts. The decision was not announced publicly until completion of Apollo 7. Gemini veterans Frank Borman and Jim Lovell, and rookie William Anders captured the world's attention by making ten lunar orbits in 20 hours, transmitting television pictures of the lunar surface on Christmas Eve, and returning safely to Earth.
The following March, LM flight, rendezvous and docking were demonstrated in Earth orbit on Apollo 9, and Schweickart tested the full lunar EVA suit with its portable life support system (PLSS) outside the LM. The F mission was carried out on Apollo 10 in May 1969 by Gemini veterans Thomas P. Stafford, John Young and Eugene Cernan. Stafford and Cernan took the LM to within of the lunar surface.
The G mission was achieved on Apollo 11 in July 1969 by an all-Gemini veteran crew consisting of Neil Armstrong, Michael Collins and Buzz Aldrin. Armstrong and Aldrin performed the first landing at the Sea of Tranquility at 20:17:40 UTC on July 20, 1969. They spent a total of 21 hours, 36 minutes on the surface, and spent 2hours, 31 minutes outside the spacecraft, walking on the surface, taking photographs, collecting material samples, and deploying automated scientific instruments, while continuously sending black-and-white television back to Earth. The astronauts returned safely on July 24.
Conrad and rookie Alan Bean made a precision landing of Apollo 12 within walking distance of the Surveyor 3 uncrewed lunar probe, which had landed in April 1967 on the Ocean of Storms. The command module pilot was Gemini veteran Richard F. Gordon Jr. Conrad and Bean carried the first lunar surface color television camera, but it was damaged when accidentally pointed into the Sun. They made two EVAs totaling 7hours and 45 minutes. On one, they walked to the Surveyor, photographed it, and removed some parts which they returned to Earth.
The contracted batch of 15 Saturn Vs was enough for lunar landing missions through Apollo 20. Shortly after Apollo 11, NASA publicized a preliminary list of eight more planned landing sites after Apollo 12, with plans to increase the mass of the CSM and LM for the last five missions, along with the payload capacity of the Saturn V. These final missions would combine the I and J types in the 1967 list, allowing the CMP to operate a package of lunar orbital sensors and cameras while his companions were on the surface, and allowing them to stay on the Moon for over three days. These missions would also carry the Lunar Roving Vehicle (LRV) increasing the exploration area and allowing televised liftoff of the LM. Also, the Block II spacesuit was revised for the extended missions to allow greater flexibility and visibility for driving the LRV.
The success of the first two landings allowed the remaining missions to be crewed with a single veteran as commander, with two rookies. Apollo 13 launched Lovell, Jack Swigert, and Fred Haise in April 1970, headed for the Fra Mauro formation. But two days out, a liquid oxygen tank exploded, disabling the service module and forcing the crew to use the LM as a "lifeboat" to return to Earth. Another NASA review board was convened to determine the cause, which turned out to be a combination of damage of the tank in the factory, and a subcontractor not making a tank component according to updated design specifications. Apollo was grounded again, for the remainder of 1970 while the oxygen tank was redesigned and an extra one was added.
The cutbacks forced mission planners to reassess the original planned landing sites in order to achieve the most effective geological sample and data collection from the remaining four missions. Apollo 15 had been planned to be the last of the H series missions, but since there would be only two subsequent missions left, it was changed to the first of three J missions.
Apollo 13's Fra Mauro mission was reassigned to Apollo 14, commanded in February 1971 by Mercury veteran Alan Shepard, with Stuart Roosa and Edgar Mitchell. This time the mission was successful. Shepard and Mitchell spent 33 hours and 31 minutes on the surface, and completed two EVAs totalling 9hours 24 minutes, which was a record for the longest EVA by a lunar crew at the time.
In August 1971, just after conclusion of the Apollo 15 mission, President Richard Nixon proposed canceling the two remaining lunar landing missions, Apollo 16 and 17. Office of Management and Budget Deputy Director Caspar Weinberger was opposed to this, and persuaded Nixon to keep the remaining missions."MEMORANDUM FOR THE PRESIDENT" by Caspar Weinberger (via George Shultz), Aug 12, 1971, Page32(of 39) [3]
Apollo 16 landed in the Descartes Highlands on April 20, 1972. The crew was commanded by John Young, with Ken Mattingly and Charles Duke. Young and Duke spent just under three days on the surface, with a total of over 20 hours EVA.
Apollo 17 was the last of the Apollo program, landing in the Taurus–Littrow region in December 1972. Eugene Cernan commanded Ronald E. Evans and NASA's first scientist-astronaut, geologist Harrison Schmitt. Schmitt was originally scheduled for Apollo 18, but the lunar geological community lobbied for his inclusion on the final lunar landing. Cernan and Schmitt stayed on the surface for just over three days and spent just over 23 hours of total EVA.
The rocks collected from the Moon are extremely old compared to rocks found on Earth, as measured by radiometric dating techniques. They range in age from about 3.2 billion years for the samples derived from the lunar mare, to about 4.6 billion years for samples derived from the Lunar highlands crust.Papike et al. 1998, pp. 5-001–5-234 As such, they represent samples from a very early period in the development of the Solar System, that are largely absent on Earth. One important rock found during the Apollo Program is dubbed the Genesis Rock, retrieved by astronauts David Scott and James Irwin during the Apollo 15 mission. This anorthosite rock is composed almost exclusively of the calcium-rich feldspar mineral anorthite, and is believed to be representative of the highland crust. A geochemical component called KREEP was discovered by Apollo 12, which has no known terrestrial counterpart. KREEP and the anorthositic samples have been used to infer that the outer portion of the Moon was once completely molten (see lunar magma ocean).
Almost all the rocks show evidence of impact process effects. Many samples appear to be pitted with micrometeoroid impact craters, which is never seen on Earth rocks, due to the thick atmosphere. Many show signs of being subjected to high-pressure shock waves that are generated during impact events. Some of the returned samples are of impact melt (materials melted near an impact crater.) All samples returned from the Moon are highly as a result of being subjected to multiple impact events.
From analyses of the composition of the returned lunar samples, it is now believed that the Moon was created through the impact of a large astronomical body with Earth.Burrows 1999, p. 431
Of this amount, $20.2 billion ($ adjusted) was spent on the design, development, and production of the Saturn family of launch vehicles, the Apollo spacecraft, spacesuits, scientific experiments, and mission operations. The cost of constructing and operating Apollo-related ground facilities, such as the NASA human spaceflight centers and the global tracking and data acquisition network, added an additional $5.2 billion ($ adjusted).
The amount grows to $28 billion ($280 billion adjusted) if the costs for related projects such as Project Gemini and the robotic Ranger Program, Surveyor program, and Lunar Orbiter programs are included.
NASA's official cost breakdown, as reported to Congress in the Spring of 1973, is as follows:
Accurate estimates of human spaceflight costs were difficult in the early 1960s, as the capability was new and management experience was lacking. Preliminary cost analysis by NASA estimated $7 billion – $12 billion for a crewed lunar landing effort. NASA Administrator James Webb increased this estimate to $20 billion before reporting it to Vice President Johnson in April 1961.
Project Apollo was a massive undertaking, representing the largest research and development project in peacetime. At its peak, it employed over 400,000 employees and contractors around the country and accounted for more than half of NASA's total spending in the 1960s. After the first Moon landing, public and political interest waned, including that of President Nixon, who wanted to rein in federal spending. NASA's budget could not sustain Apollo missions which cost, on average, $445 million ($ adjusted) each while simultaneously developing the Space Shuttle. The final fiscal year of Apollo funding was 1973.
The S-IVB orbital workshop was the only one of these plans to make it off the drawing board. Dubbed Skylab, it was assembled on the ground rather than in space, and launched in 1973 using the two lower stages of a Saturn V. It was equipped with an Apollo Telescope Mount. Skylab's last crew departed the station on February 8, 1974, and the station itself re-entered the atmosphere in 1979 after development of the Space Shuttle was delayed too long to save it.
The Apollo–Soyuz program also used Apollo hardware for the first joint nation spaceflight, paving the way for future cooperation with other nations in the Space Shuttle and International Space Station programs.
Beginning in 2009, NASA's robotic Lunar Reconnaissance Orbiter, while orbiting above the Moon, photographed the remnants of the Apollo program left on the lunar surface, and each site where crewed Apollo flights landed. All of U.S. flags left on the Moon during the Apollo missions were found to still be standing, with the exception of the one left during the Apollo 11 mission, which was blown over during that mission's lift-off from the lunar surface; the degree to which these flags retain their original colors remains unknown. The flags cannot be seen through a telescope from Earth.
In a November 16, 2009, editorial, The New York Times opined:
Technologies and techniques required for Apollo were developed by Project Gemini. The Apollo project was enabled by NASA's adoption of new advances in semiconductor electronic technology, including metal–oxide–semiconductor field-effect transistors (MOSFETs) in the Interplanetary Monitoring Platform (IMP) and silicon integrated circuit chips in the Apollo Guidance Computer (AGC).
The Apollo program also affected environmental activism in the 1970s due to photos taken by the astronauts. The most well known include Earthrise, taken by William Anders on Apollo 8, and The Blue Marble, taken by the Apollo 17 astronauts. The Blue Marble was released during a surge in environmentalism, and became a symbol of the environmental movement as a depiction of Earth's frailty, vulnerability, and isolation amid the vast expanse of space.
According to The Economist, Apollo succeeded in accomplishing President Kennedy's goal of taking on the Soviet Union in the Space Race by accomplishing a singular and significant achievement, to demonstrate the superiority of the capitalism. The publication noted the irony that in order to achieve the goal, the program required the organization of tremendous public resources within a vast, centralized government bureaucracy.
Program delays
Apollo 1 fire
Uncrewed Saturn V and LM tests
Crewed development missions
Production lunar landings
Mission cutbacks
Extended missions
Canceled missions
Mission summary
Source: Apollo by the Numbers: A Statistical Reference (Orloff 2004).
First flight of Saturn IB and Block I CSM; suborbital to Atlantic Ocean; qualified heat shield to orbital reentry speed. No spacecraft; observations of liquid hydrogen fuel behavior in orbit to support design of S-IVB restart capability. Suborbital flight of CSM to Pacific Ocean. Not flown. All crew members died in a fire during a launch pad test on January 27, 1967. First test flight of Saturn V, placed a CSM in a high Earth orbit; demonstrated S-IVB restart; qualified CM heat shield to lunar reentry speed. Earth orbital flight test of LM, launched on Saturn IB; demonstrated ascent and descent propulsion; human-rated the LM. No crew. Uncrewed, second flight of Saturn V, attempted demonstration of trans-lunar injection, and direct-return abort using SM engine; three engine failures, including failure of S-IVB restart. Flight controllers used SM engine to repeat Apollo 4's flight profile. Human-rated the Saturn V. First crewed Earth orbital demonstration of Block II CSM, launched on Saturn IB. First live television broadcast from a crewed mission. First crewed flight of Saturn V; First crewed flight to Moon; CSM made 10 lunar orbits in 20 hours. Second crewed flight of Saturn V; First crewed flight of CSM and LM in Earth orbit; demonstrated portable life support system to be used on the lunar surface. Dress rehearsal for first lunar landing; flew LM down to from lunar surface. First landing, in Tranquility Base, Sea of Tranquility. Surface EVA time: 2h 31m. Samples returned: . Second landing, in Ocean of Storms near Surveyor 3. Surface EVA time: 7h 45m. Samples returned: . Third landing attempt aborted in transit to the Moon, due to SM failure. Crew used LM as "lifeboat" to return to Earth. Mission called a "successful failure". Third landing, in Fra Mauro formation. Surface EVA time: 9h 21m. Samples returned: . Fourth landing, in Hadley-Apennine. First extended mission, used Rover on Moon. Surface EVA time: 18h 33m. Samples returned: . Fifth landing, in Plain of Descartes. Second extended mission, used Rover on Moon. Surface EVA time: 20h 14m. Samples returned: . Only Saturn V night launch. Sixth landing, in Taurus–Littrow. Third extended mission, used Rover on Moon. First geologist on the Moon. Apollo's last crewed Moon landing. Surface EVA time: 22h 2m. Samples returned: .
Samples returned
Costs
8.5 9.1 0.9 1.7 20.2 0.9 1.8 2.5 25.4
Apollo Applications Program
Recent observations
Legacy
Science and engineering
Cultural impact
Apollo 11 broadcast data restoration project
Depictions on film
Documentaries
Docudramas
Fictional
See also
Notes
Citations
Sources
Further reading
External links
NASA reports
Multimedia
|
|